Building intelligence by Apexion

Upgrade potential of 1.5 million buildings.

ATLAS maps energy and retrofit opportunities across 1.5 million UK commercial buildings, connecting building evidence, decision-makers, installers and capital to develop projects at scale.

THE CONNECTED ASSET
What is there, and what could fit?. Illustrative layered warehouse diagram.01 / FABRIC02 / SPACE
What is there, and what could fit?

The form, fabric, systems and constraints of the asset establish the physical starting point.

Illustrative relationships
Chapters13 chapters
All 13 chapters

Reading index

The national opportunity

Search every UK commercial building.

Start with the wider building landscape, then zoom into a site and the information available about its spaces, occupiers, energy use and property interests.

Search and filter

Filter by every building conclusion.

Narrow the search by location, building type, roof area, energy demand and upgrade fit. Add economics, planning, grid, ownership and evidence conditions to find projects that match your requirements.

Search filters

Filter group

Define the opportunity before you shortlist.

Combine location, building characteristics, technical fit and commercial readiness. Choose a filter group below.

Checks and evidence3

ATLAS’s Prospects view combines nine filter groups. Select one or more retrofit areas and match any or all of them, then review results on a map, in a list or as cards.

Candidate opportunities have potential identified or conditional status. Other states can be included explicitly. A screening score helps prioritise investigation; it does not establish consent, credit approval or technical suitability.

Next stepOpen a matching building and inspect the reason it appears in your results.

Choose an installer search or start with a building you already own or occupy.

Investigate the results

Build a portfolio of qualified opportunities.

Review results on a map, in a list or as cards. Compare potential, energy use, returns and delivery risks, then see what remains unresolved for each building.

Installer and owner routes

Find projects you can develop.

Search the portfolio, investigate a candidate and build a proposal around its evidence and decision route.

Checks and evidence3

Use Prospects to combine retrofit areas with location, roof, energy, financial and readiness criteria. Quick views include PPA solar, electrification candidates, freehold titles and low planning risk.

Open the building’s 3D view, inspect interests and energy, compare retrofit assessments, then use the contact plan. Pipeline stages show Identified, Assessing, Qualified and Funding Review, with outstanding conditions visible.

Next stepCarry scope, evidence and the remaining conditions into the Project Funding Portal.

Start with the building you know.

Find your building, describe your relationship and contribute the records that complete its assessment.

The Building Portal is a separate route for owners, head leaseholders, occupiers and authorised managing agents. Identify the legal organisation, the whole building or unit you represent, and the meters your records relate to.

Contribute energy data, bills, equipment schedules, floor plans, leases and operating hours. Review the upgrade assessment, agree the scope, explore funding and plan a delivery handoff. A building claim remains subject to identity and property-interest checks.

Checks and evidence
  • Confirm your organisation, area and meter scope
  • Bring operating data and property-interest evidence
  • Review upgrades, conditions and the route to delivery

Next stepUse the assessment to begin the scope, approvals and funding conversations.

The physical building

Explore the building layout.

Explore units, roof zones, parking, plant and access in one building view. Inspect usable roof space, shading, skylights, structure, condition and the checks needed on site.

Roof constraints

The roof is a starting point, not the whole answer.

Usable area, condition and constraints influence the scope of a rooftop project.

Checks and evidence3

A roof may contain skylights, plant, access routes and areas that cannot be used. Its shape and surroundings influence where equipment could fit.

Physical potential needs to be connected to structure, condition and access before a scheme can be developed. The first view of a roof opens the investigation; it does not replace a survey.

Next stepEstablish a credible design brief for the site.

Look through three lenses to understand the asset shown in the film.

Operations and energy

Energy usage and operations.

Connect occupiers and operating hours to equipment, electricity demand, meters and occupied space. Distinguish tenant-controlled systems from landlord plant and common-area supplies.

Site operations and existing systems

Understand what the building does all day.

Manufacturing, storage and office activity create different needs for energy and space.

Checks and evidence3

Inspect individual units, their occupiers and their operating schedules. ATLAS separates tenant systems from common-area equipment so responsibilities can be investigated at the right level.

Installation needs to work around occupied operations. Confirm equipment ownership, maintenance obligations, access and shutdown authority for the specific measure.

Next stepMatch the proposed improvement to operational needs.

Connect each meter to the right payer.

Trace electricity accounts, common-area supplies and equipment demand separately.

A multi-occupied building can have separate tenant meters and landlord accounts. Candidate mappings need circuits, supply contracts and recharge arrangements to be checked before benefits are allocated.

Electricity payment does not establish who pays for gas or heat. Electrical headroom, peak heat demand and distribution temperatures are also distinct questions for storage, charging or heating upgrades.

Checks and evidence
  • Meter circuits, account holders and recharge terms
  • Tenant equipment versus common-area systems
  • Electrical capacity and heating baseline

Next stepAsk for meter data, bills and system records for the affected spaces.

One connected assessment

Physical, legal, operational and commercial evidence.

Assess the building across physical, legal, operational and commercial dimensions. See the records behind each conclusion, what still needs checking and whether the project has technical potential, decision authority and commercial readiness.

Understand the four layers

What is there, and what could fit?

The form, fabric, systems and constraints of the asset establish the physical starting point.

Checks and evidence3

Roof, floor space, building fabric, plant and external areas each matter for different technologies. A useful model connects those elements to the specific measure being considered.

ATLAS brings that physical picture together with legal, operational and commercial context, so an attractive technical idea can be tested against the reality of the asset.

Next stepIdentify the technical questions that need resolving.

Select a layer to see what it contributes to the project decision.

Who has the rights that matter?

Titles, leases and consents explain which parties need to be involved.

Ownership is only one part of the approval picture. A head lease, occupational lease, shared area or separately controlled piece of equipment may introduce other relevant interests.

The legal layer connects the building to those interests. It makes clear why a project needs an approval route as well as a technical design.

Checks and evidence
  • Freehold and leasehold interests
  • Rights over the relevant space
  • Consent requirements and open questions

Next stepMap the permissions needed to progress.

Who uses, pays for and controls it?

Occupancy, energy responsibility and equipment control may sit with different people.

The business at the address may occupy only part of the property. The occupier may pay an energy bill without controlling the roof or the plant serving the space.

Connecting these responsibilities helps explain who benefits from an intervention and who needs to participate in making it happen.

Checks and evidence
  • Occupiers and use of space
  • Energy payers and metering
  • Equipment and maintenance responsibility

Next stepConnect the benefit to the parties affected.

Does the project make sense to act on?

Costs, benefits, responsibilities and delivery conditions shape the commercial case.

The building record brings source references and unresolved questions alongside the assessment. Evidence can include property titles, leases, company records, energy accounts, site surveys and network enquiries.

Keep technical potential, decision authority and commercial readiness separate. The next action should name the gap to close, whether that is a survey, an executed lease, a payer mapping or an approval mandate.

Checks and evidence
  • Expected costs and benefits
  • Responsibilities and project timing
  • Funding structure and delivery route

Next stepTurn the evidence into a decision-ready proposal.

Property interests

Ownership, occupants, leases and management.

Trace the registered owner, freehold, head lease and occupational interests. Connect each organisation to the space it owns, occupies or manages, including its corporate parent or appointed asset manager.

Property interests

Start with the underlying ownership.

The freeholder’s interest connects the land and property to the wider approval picture.

Checks and evidence3

Identify the registered property interest and distinguish it from a corporate parent, beneficial ownership record or proposed asset manager. Corporate ownership helps identify the organisation but does not establish a consent route.

A freeholder may retain reserved matters while a head lessee controls other rights. Review executed documents and any management mandate for the affected roof, equipment or shared space.

Next stepConnect the ownership record to the relevant leases.

Follow the relationships in the film. Select an interest to understand its role.

Understand the rights between owner and occupier.

A lease can shape control of space, consent requirements and the duration available to a project.

A building can sit beneath several leasehold interests. A head lessee and an occupational tenant may have different responsibilities and different rights to alter the property.

The proposed intervention needs to be connected to the relevant space and terms. An address or company name alone cannot establish permission to install equipment.

Checks and evidence
  • Executed head and occupational leases
  • Alteration, access, repair and export provisions
  • Reserved matters and management-mandate limits

Next stepResolve the approval questions before progressing the scope.

Connect the project to the business inside.

The occupier may experience the benefit and disruption without controlling every decision.

Occupiers bring the operational perspective: how the building is used, when energy is needed and how installation would affect the business.

A strong project story aligns that perspective with the rights of owners and leaseholders. ATLAS connects these roles so the team can identify who needs to be consulted, who benefits and who can approve.

Checks and evidence
  • Affected units and operational responsibilities
  • Meter payers, recharge terms and benefit allocation
  • Each party’s consent and documented signing scope

Next stepBring the relevant parties into the same project conversation.

Rights and permissions

Understand rights and controls.

Examine the rights relevant to installation, alteration, access, maintenance, repair and electricity export. Identify where consent sits and which documents or delegated powers still need confirmation.

Rights holders

Resolve the property and equipment rights.

Asset director, estates manager or the relevant equipment controller.

What to establish

Confirm installation, access, repair obligations and export rights; obtain the relevant leases and management mandate.

Why it matters

Define a consent route that protects asset performance and occupied operations.

Checks and evidence

Next stepRun this alongside the demand conversation where appropriate.

People and commercial roles

Identify who uses, pays for and decides on an upgrade.

The occupier, electricity buyer, equipment controller, property decision-maker and investor may be different organisations. Map their interests before approaching the operating lead and property stakeholders.

People and commercial roles

Control & consent8 options
Building responsibility

Roles depend on the intervention. Responsibilities can be shared.

Eight roles behind one building.

Select a responsibility to see who is involved and what needs confirming.

Checks and evidence3

The same organisation can perform several roles, and one role may involve several organisations. ATLAS maps responsibilities to the selected intervention.

The purpose is to connect people to the exact space, equipment, account or agreement they can influence. A contact match alone does not prove authority.

Next stepUse the contact plan to turn responsibilities into next conversations.

People & interests3 options
Your perspective

A useful route for every participant.

Choose how you would enter ATLAS and what to take into the next conversation.

Checks and evidence3

Installers, owners and capital participants approach the same building with different information and decisions to make.

ATLAS connects their technical, operational and commercial questions around a shared project scope.

Next stepChoose a perspective to see the route.

Explore who controls the building, who needs to agree, and the order of conversations.

Owners

Make the value to the asset clear.

Owners and occupiers need to understand the outcome, obligations and practical impact.

Checks and evidence3

A proposal should explain how an upgrade relates to the building’s future. The expected benefit matters alongside responsibilities, disruption, ongoing operation and the terms of any arrangement.

Connected building intelligence helps frame the decision in the context of the actual asset, rather than presenting a technology in isolation.

Next stepAssess a proposal with a clear view of its conditions.

Capital

Give capital a project it can assess.

Funding decisions need a coherent scope, economics and a credible route to delivery.

Checks and evidence3

Capital providers need to understand what is being developed, the basis of the commercial case and the conditions still to be resolved. A list of potential sites is not the same as a qualified project.

ATLAS’s connected approach is intended to help the parties build that shared picture. Financing supports the project structure and remains subject to its own assessment and agreement.

Next stepStructure funding around a clearly understood opportunity.

Route to sign-off

Build a clear path to agreement.

Align who pays, benefits, invests and grants access. Confirm the affected parties, named signatories, delegated authority and financial limits, then coordinate specialist checks and network enquiries.

Approval pathway

Verify who can actually approve.

Named approvers for every proposed contract and legal entity.

What to establish

Request board or delegated-authority evidence naming the authorised signatories and financial limits.

Why it matters

Create an executable transaction with a defined approval scope for each party.

Checks and evidence

Next stepA job title, company ownership or PSC record does not settle signing authority.

Solar example. Rights checks can run alongside demand; other measures have different routes.

Start with the champion. Build the agreement.

Five conversations connect the operating need to an executable project.

ATLAS’s contact plan changes with the selected retrofit. The sequence shows the ask, the value to each party and the evidence needed to progress.

Property-rights work can run alongside the first demand conversation. Every proposed contract still needs its own approvers and signatories.

Checks and evidence
  • Confirm the need and scope
  • Align rights, payers and counterparties
  • Verify authority and coordinate delivery

Next stepSelect a step to prepare the next conversation.

Start with the project champion.

Operations or facilities lead · the organisation using the building.

What to establish

Confirm daytime demand, supply contracts and appetite for a PPA or direct investment.

Why it matters

Test a route to lower purchased electricity costs while keeping roof consent and credit review open.

Checks and evidence
  • Energy account relationships
  • Organisation and contact resolution
  • Delegation and role evidence

Next stepConfirm the need and scope before progressing a commercial proposal.

Resolve the property and equipment rights.

Asset director, estates manager or the relevant equipment controller.

What to establish

Confirm installation, access, repair obligations and export rights; obtain the relevant leases and management mandate.

Why it matters

Define a consent route that protects asset performance and occupied operations.

Checks and evidence
  • Registered property interest
  • Executed head and occupational leases
  • Management mandate and authority

Next stepRun this alongside the demand conversation where appropriate.

Align the people paying and benefiting.

Affected electricity buyers, occupiers and other project counterparties.

What to establish

Agree payer and beneficiary allocation, access, investment responsibilities and the intended contracting model.

Why it matters

Give every participating organisation a clear benefit, cost and operational commitment.

Checks and evidence
  • Meter and account mappings
  • Each affected occupational lease
  • Proposed commercial responsibilities

Next stepResolve consent separately for every affected leaseholder.

Coordinate design, delivery and capital.

Specialist advisers, network operator, installer, potential investor and insurer.

What to establish

Confirm design, roof warranty, connection conditions, delivery appointments and any finance requirements.

Why it matters

Convert the agreed scope into coordinated delivery and, where relevant, an investment review.

Checks and evidence
  • Site surveys and equipment walk-through
  • Electrical design and network enquiry
  • Delivery programme and funding conditions

Next stepAgree appointments and terms after the remaining evidence has been reviewed.

Every retrofit option

Explore all retrofit upgrades.

Assess each measure against the building’s spaces, demand, systems, rights and infrastructure. Open an upgrade to see its potential, requirements and outstanding checks.

Compare the upgrade options

Is this the right roof for solar?

The first assessment connects usable space, demand, constraints and permissions.

Checks and evidence3

Rooftop solar is Apexion’s entry point into building upgrades. It brings together a visible physical opportunity and a set of less visible questions about how the site works.

Roof layout, structural questions, energy use, electrical infrastructure and approval rights all contribute to the case. Each needs appropriate evidence before the project is developed.

Next stepBuild a scope for design, survey and due diligence.

Explore the three questions behind the solar transformation in the film.

Roofing

Start with the condition of the roof.

Connect roof condition, leaks, drainage and remaining service life to repair or replacement needs, planned solar and occupied-site access.

Review roof surveys, repair history, warranty information and known structural constraints to understand the work the roof may need.

Connect repair or replacement plans to maintenance responsibilities, access arrangements and any proposed solar installation.

Checks and evidence
  • Roof surveys, repair history and existing warranty information
  • Roof construction, drainage and known structural constraints
  • Roof rights, maintenance responsibilities and access arrangements

Next stepDefine a roofing scope that coordinates repairs, other upgrades and the needs of the people using the building.

Battery storage

Connect stored energy to a real need.

Battery storage depends on the site’s load, generation and intended operating role.

Storage is most useful to investigate in relation to how a site uses and produces electricity. The proposed role, equipment location and electrical constraints all influence its suitability.

The building view helps teams ask how a storage measure would interact with solar, charging and existing demand. Combining technologies requires a joined-up assessment of benefits and costs.

Checks and evidence
  • Load, generation and the battery’s operating role
  • Fire design, space and maintenance access
  • Import/export limits and shared electrical headroom

Next stepDefine the role of storage within the wider energy plan.

EV charging

Match charging to vehicles and the site.

Parking, dwell time, fleet use and electrical capacity shape a charging opportunity.

A workplace car park and an operational fleet yard create different charging requirements. Vehicle use and dwell time affect what equipment may be appropriate.

Control of the parking area, available infrastructure and operational access also matter. The opportunity needs to be connected to the parties responsible for those spaces and systems.

Checks and evidence
  • Vehicles, users and dwell times
  • Parking rights and access
  • Electrical capacity and site operations

Next stepConnect the charging requirement to a workable site plan.

HVAC

Match the systems to the working building.

Review heating, cooling and ventilation equipment alongside comfort needs, occupancy, controls and operating schedules.

Bring plant schedules, condition reports and maintenance records together with operating hours and controls settings.

Identify equipment ownership, replacement plans and installation access for each affected system.

Checks and evidence
  • Plant and equipment schedules, condition and maintenance records
  • Operating hours, controls settings and heating or cooling demand
  • Equipment ownership, replacement plans and installation access

Next stepConnect comfort, air quality and operational requirements to a coordinated equipment and controls assessment.

Heat pumps

Build the picture of heat demand.

Assess the building’s heat demand, fabric and existing heating distribution alongside space, electrical capacity and operating needs.

Connect heating fuel use and demand patterns to the existing plant, distribution temperatures and building fabric.

Review the space, electrical capacity and equipment responsibilities that would affect a proposed heating upgrade.

Checks and evidence
  • Heating fuel use, demand patterns and existing plant information
  • Heat distribution, operating temperatures and building fabric records
  • Space, electrical capacity and equipment-control responsibilities

Next stepDevelop a heating assessment grounded in the building’s demand and the changes needed to support electrification.

Insulation and fabric

Understand where the building loses heat.

Review the roof, walls, glazing and air leakage alongside fabric condition, ventilation and planned building works.

Bring fabric surveys and construction details together with existing insulation, heating use and comfort concerns.

Review known moisture or ventilation issues, repair responsibilities and planned refurbishment before defining the scope.

Checks and evidence
  • Fabric surveys, construction details and existing insulation
  • Heating use, comfort concerns and known moisture or ventilation issues
  • Repair responsibilities, access and planned maintenance or refurbishment

Next stepPrioritise fabric improvements alongside heating and ventilation so the measures work together.

Lighting and efficiency

Connect efficiency to how the space is used.

Review lighting, controls and equipment use against occupancy, operating hours and the needs of each space.

Connect lighting and equipment inventories to operating schedules, occupancy patterns and electricity use.

Identify control settings, maintenance plans and access constraints for the spaces being assessed.

Checks and evidence
  • Lighting and equipment inventories, controls and condition
  • Operating schedules, occupancy patterns and electricity use
  • Equipment responsibilities, maintenance plans and access constraints

Next stepDefine practical efficiency measures and the baseline needed to assess their benefits.

Electrical and grid infrastructure

Establish the capacity behind the upgrade.

Connect existing demand and proposed upgrades to the site’s electrical distribution, metering and import or export constraints.

Bring electrical diagrams, meter information and capacity records together with demand profiles and planned generation or loads.

Review network correspondence, equipment responsibilities and access arrangements alongside the proposed upgrades.

Checks and evidence
  • Electrical diagrams, meter information and existing capacity records
  • Demand profiles and the requirements of planned generation or loads
  • Network correspondence, equipment responsibilities and access arrangements

Next stepIdentify the infrastructure checks and network enquiries needed to support the proposed programme.

Value

Explain how the benefit could be created.

Compare direct capital investment and a power purchase agreement against the same site, demand and rights.

Inspect generation, self-consumption, electricity-price assumptions, capital costs, maintenance and the time basis of the return. Distinguish a standalone solar scenario from a combined building package.

A PPA changes who invests and how electricity is purchased. Direct CapEx requires a named investing party. Both depend on the agreed consent route, responsibilities and commercial terms.

Checks and evidence
  • Generation, on-site use and price assumptions
  • Direct CapEx versus PPA structure
  • Payers, beneficiaries and contract responsibilities

Next stepDevelop a case each relevant party can assess.

Delivery

Make the route to installation explicit.

The opportunity progresses when scope, approvals, delivery and responsibilities align.

A promising site still needs a developed design, agreed responsibilities and an installation plan. Access, business continuity and coordination between parties can shape how the work is carried out.

Apexion connects initial discovery to these project-development questions, helping teams carry useful context forward instead of starting again at every stage.

Checks and evidence
  • Design and survey requirements
  • Consents and agreements
  • Delivery scope, access and responsibilities

Next stepMove the qualified opportunity into project development.

Heat & efficiency

Understand demand before changing systems.

Building fabric, heating, equipment and operating patterns belong in the same conversation.

ATLAS covers HVAC, heat pumps, insulation and energy efficiency as distinct assessments. Check the thermal baseline, fabric condition, equipment ownership and heating distribution before prioritising a measure.

Building electrification and infrastructure programmes coordinate underlying projects. Package economics count distinct investments once and adjust overlapping savings; finance is a commercial structure.

Checks and evidence
  • Heat demand, distribution temperatures and fabric
  • Equipment ownership and repair responsibilities
  • Package dependencies and overlapping benefits

Next stepAssess a coordinated set of suitable interventions.

Funding preparation

Package projects and portfolios for funding.

Bring the proposed scope, quotes, programme, energy records, rights and counterparties into a funding assessment. State the capital required, the proposed structure and the obligations each party would take on.

Prepare a funding assessment

Define the work and the parties involved.

Set out the proposed work, affected buildings and the organisation submitting the project.

Checks and evidence3

Define the proposed measures, the buildings or units involved and the intended delivery programme. Include available designs, specifications and quotations.

Identify each organisation’s role and keep the permissions, access arrangements and unresolved checks attached to the scope.

Next stepCarry the defined scope into the funding evidence pack.

Follow the path from first signal to a project that can be developed.

Evidence pack

Prepare a project that can be reviewed.

Carry one building or a portfolio into the Project Funding Portal.

The installer route moves through Project scope, Project data, ATLAS review and Capital route. Define the submitting organisation and its role, the affected buildings and the proposed work.

Bring scope, specifications, quotations, programme, energy data, rights and counterparties together with the capital requirement. The review keeps technical potential, decision authority and commercial readiness distinct.

Checks and evidence
  • Design, costs and delivery programme
  • Energy data, rights and counterparties
  • Funding request, equity and preferred structure

Next stepReview the package and its outstanding conditions before choosing a capital route.

Capital requirement

Make the funding request clear.

State the capital required, proposed structure and obligations each party would take on.

Bring together project costs, available equity and the amount of funding sought. Explain whether direct investment, a PPA or another relevant funding structure is being explored.

Connect the request to the same energy assumptions, counterparties, rights and proposed scope used in the project assessment. Funding remains subject to review and agreed terms.

Checks and evidence
  • Project costs and capital required
  • Available equity and proposed structure
  • Counterparties, obligations and financial assumptions

Next stepReview the capital requirement alongside the technical and legal evidence.

Portfolio view

Package a consistent portfolio for review.

Bring qualified projects together while retaining the evidence and conditions for each building.

Installers can prepare one project or a portfolio through the Project Funding Portal. Keep the scope, programme, costs and funding requirement visible for every project.

Retain building-specific energy records, rights, counterparties and outstanding checks. Portfolio packaging does not replace the assessment of each participating asset.

Checks and evidence
  • A clear scope and costs for each project
  • Building-specific energy, rights and counterparties
  • Combined capital request and delivery programme

Next stepPresent the portfolio with the conditions still to be resolved.

From funding to delivery

Move from assessment to funded delivery.

Compare direct investment, a PPA, a funding partner or an ATLAS funding assessment where relevant. Owners can carry their building assessment forward; installers can package qualified projects and portfolios for review.

Explore funding & delivery

Choose the funding route to explore.

Consider a funding partner or an ATLAS funding assessment where relevant.

Checks and evidence3

Partner review may consider a PPA, asset finance or project finance against the provider’s mandate. An ATLAS funding route is assessed case by case against strategic fit, investment approval and available capital.

Owners and occupiers can carry their building assessment into Funding & delivery. Installers can package a single project or a portfolio. Both routes need verified economics, documented rights, counterparty diligence and agreed terms.

Next stepFunding availability and approval depend on project evidence, review and agreed terms.

Owner route

Carry your building assessment forward.

Owners and occupiers can connect a building assessment to funding and delivery.

Contribute the building records, review the proposed upgrades and their conditions, and agree the scope with the affected parties.

Explore direct investment, a PPA, a funding partner or an ATLAS funding assessment where relevant. Confirm rights, commercial responsibilities and the reviews required before arranging delivery.

Checks and evidence
  • Agreed scope and supporting building records
  • Property rights and affected-party approvals
  • Commercial structure and delivery responsibilities

Next stepProgress the assessment through the relevant funding and delivery review.

Installer route

Bring qualified projects into funding review.

Package a single project or a portfolio with its scope, evidence and funding requirement.

The installer route moves through Project scope, Project data, ATLAS review and Capital route. Bring design, quotes, programme, demand, rights and counterparties into one package.

Explore the relevant funding structure and retain the conditions still requiring confirmation. Appointments and delivery follow the agreed scope, approvals and commercial terms.

Checks and evidence
  • Project scope, quotations and programme
  • Energy evidence, rights and counterparties
  • Capital requirement and preferred structure

Next stepPrepare the project for review before progressing capital and delivery arrangements.

Delivery plan

Make the next action explicit.

Validate the building, agree the project and funding, then appoint the right delivery team.

Reconcile meter data, survey the asset and resolve the rights required for the scope. Agree named approvers, benefit allocation and commercial responsibilities.

Review delivery proposals, arrange installation access and phase works around the occupiers. Pipeline stages retain the outstanding conditions so a Funding Review label is not mistaken for a committed project.

Checks and evidence
  • Validate the building and approval evidence
  • Agree the scope, funding and allocation of benefits
  • Appoint delivery partners and plan occupied-site access

Next stepCarry the same evidence and responsibilities into the next building.

The next chapter is yours.

Make the connection.

Bring what you’ve discovered to the project you have in mind.